
Project E45 Järnvågen
The E45 Järnvågen project shall involve the Göta tunnel’s existing on and off ramps being extended through covering and the urban space around the Masthugg quay being developed. In connection with this, the air quality must be improved in the tunnel opening’s immediate are; at the same time, the tunnel safety in the extended ramp tunnels shall be improved.
TFIP’s role in the project involves the design planning of all systems and all equipment pertaining to tunnel ventilation, as well as to the controls.
More Projects
Stockholm Bypass
E4 Stockholm Bypass is a 21-km long new expanse of E4 which is largely built…
Project E45 Järnvågen
The E45 Järnvågen project shall involve the Göta tunnel’s existing on and off ramps being…
Interchange at E18 between Jakobsberg and Hjulsta
TFIP cooperates with Tyréns in the E18 Jakobsberg interchange project between Hjulsta junction. TFIP designs…
The Varberg Tunnel
TFIP has composed tender documentation for the procurement of a turnkey contract for the technical…
The Marieholm Tunnel
TFIP heads the progress of the project on behalf of our cooperative partners. The Marieholm…